Rovertym Heavy Duty Slider Install

In addition to the now familiar Rovertym Slider design, Rovertym also offers a heavy duty version of their sliders, made up of thicker steel.

slidermount1_sm.gif - 23225 Bytes slidermount2_sm.gif - 20827 Bytes

These sliders also have two addititonal mounting points for additonal rigidity.

crate_sm.gif - 22758 Bytes

As with all Rovertym products, the sliders came shipped in sturdy, wooden shipping crates.

The Heavy Duty sliders are available with or without nerf bars. I chose to get them without nerf bars, since that suits my particular off roading needs better. The installation process is very similar to the Disco II Slider Install writeup, with some added steps for the additional mounting points. The extra front mounting point does require the front doors to be removed, but we will get to that....

The list of tools needed for the install is the same:

Since my new set of sliders are a replacement for an existing set of sliders from another manufacturer, I did not have to remove any plastic sills. Instead, I simply unbolted the sliders that were to be replaced.

Once the old sliders were off, I lined up the first Rovertym slider to be mounted for the first test fitting. I used a floor jack to hold the slider in place. You may also want to use clamps depending on what kind of jack you have, but for me the floor jack was sufficient.

testfit1_sm.gif - 21958 Bytes testfit2_sm.gif - 20928 Bytes

It is important that the slider is lined up properly before you start drilling holes for the rivnuts. Note the gap between the slider and the fender in the left picture. The slider is lined up properly, but the fender was damaged when the previous slider bent up into the fender in that area.

Once the slider is lined up, mark where the holes for the rivnuts are to be drilled. I decided to mark a hole for one rivnut at the rear end of the slider first, mount a rivnut there, and use that to hold the slider in place while I realign it to mark the rest of the holes. Pay attention to the extra mounting points, it is important that they line up right with the door frame.

At this point, you need to remove the front door in order to drill a hole for the mounting point that attaches to the front of the door frame. I chose to skip this step at this point, because I was getting ready to go to Moab, and did not have time to remove and reattach the doors at this time. I will remove the sliders and perform this step at a later date. However, the steps to remove the front door is as follows:

Reverse the above steps to put the door back on.

holeready_sm.gif - 22208 Bytes

The first hole has been drilled. Spray some primer around it to protect the exposed metal.

firstrivnut_sm.gif - 20513 Bytes

Then the first rivnut is installed.

Then remount the slider, line it up, (hold the front end in place with the jack) and mark the rest of the holes. Remove it again, and drill out the rest of the rivnut holes rivnut holes on the side of the sill. Don't drill the holes for the bottom rivnuts yet. Then mount and adjust the slider again.

allrivnuts_sm.gif - 22452 Bytes

All the rivnuts on the side of the sill has been installed. The other holes were used to mount the previous slider.

With the slider mounted and adjusted, drill out the holes for the rivnuts that go on the bottom of the slider. Remove the slider again, fit the rivnuts, and remount the slider.

Now it's time to drill out the holes for the underbelly slider that comes with the Rovertym sliders. The underbelly slider is secured with 6 large bolts that goes through the sill:

drillguide_sm.gif - 20917 Bytes

Rovertym includes a handy drill guide that will make it easy to drill a guide hole on the inside of the slider.

Once the guide holes are drilled, enlarge them and fit the large bolts through the holes. Attach the the underbelly slider to the bolts, and fit bolts and washers. Adjust as needed, then tighten everything up.

insidebolts_sm.gif - 21537 Bytes

The inside bolts have been fitted.

done_sm.gif - 19061 Bytes

Once everything is tightened up, we are done.